What's new

Underconstruction Topic

Status
Not open for further replies.
Sorry to double post but all these eurofighters have given me ideas!

Have no name as yet, but heres a screeshot.

Ethereal-080216023742000.jpg
 
^Just look at other Eurofighters and see how they do it. That's normally the best way to support rides.
 
Normally I'd try to keep the layout a secret from you...but since this ride is soo small it's kinsa hard...so right now i'm gunna go all out and show you it, theres not much left to be seen after that last screen I showed it.

Keep in mind the ride is supposed to be like a 320+ model and for smaller park. So see the ride as if though you own a small park :)

The ride does pack a punch how ever, with the max +gs at 4.9 (sometimes hitting 5) and the max -gs being 1.2 (sometimes hitting 1.3) it's no kiddy coaster

forcemajeure20802171454vy8.png
 
^'im swtiching them out now, I jsut had them there to make the ride seem more...complete, honest to god.
 
Good. :p

Eclipse is being put on hold for the moment, so I'm starting a new Maverick-style coaster.

Pics will be up probably tommorow.
 
No problem.

But, I must admit that are a bunch of Intamins going around at the moment.

Also, don't get your hopes so high for Eclipse. I'm not so sure its going to go forward, as I can't get the train back the the freakin' station! :p
 
SFMMMan17 said:
Also, don't get your hopes so high for Eclipse. I'm not so sure its going to go forward, as I can't get the train back the the freakin' station! :p
Do you have the booster section on both ways or only the first pass?
I could take a quick look if you need some advise.
 
^Thanks.

If you want me to post the track file, you could have it. Maybe you'd like to continue on with it...?
 
^ That's up to you, but I will probably not continue with it (but who knows...)
 
The problem as I see it is that the booster section only gives the speed that it needs to clear the second loop, but on the way back it doesn't compensate for the speed lost from first loop to the booster section, so to clear the way back you would need to add so much speed to the booster so that you get the same speed at the first loop as it had when the train pass it the first time.

But I would probably do a redesign of the track and switch place of the loops, taking the lower one first.

And I have a project to finish first before I can start on anything else.
 
Ultimate Coaster said:
Boo Eclipse then. Yay for Jer's Gerstlauer.

yay for me :)

anyway do you guys think this last inversion has enough supporting?

forcemajeure20802181751lo9.png


if not I can fit a support inbetween the current and one before.
 
Status
Not open for further replies.
Top