IOA | Hagrid's Motorbike Adventure | Intamin LSM Launch (Dragon Challenge replacement)

42841518412_131a3733a2_h.jpg
42841516202_b96a6b05c4_h.jpg
42171198874_cfc01ea117_h.jpg

LSMs are being installed
 
Why are the LSMs only in groups of 6 and not covering the whole track? Or are they just yet to be installed? I assume they went for LSMs instead of drive tyres for maintenance reasons.
 
^They're just being installed in sections, think someone on InsideUniversal pointed out the connections for more can be seen on bits with them missing.
 
^They're just being installed in sections, think someone on InsideUniversal pointed out the connections for more can be seen on bits with them missing.
I was talking to Dan from Midway Mayhem earlier, and he said that they always have the attachment points along the entire launch section, even if they don’t get used, so I’m guessing there are no more LSMs to be installed as I see no other reason for them to start installing like they did.

Those are some HIGH QUALITY images!
Thanks! :)
 
I don't think this is going to be as slow as some are assuming in certain areas of the ride.
I agree! The launches could be fast for all we know!

I'm really looking forward to seeing how this turns out; I absolutely adore IOA (and Universal Orlando as a whole!), and all the present Potter stuff is absolutely breathtaking! Even more so for me, as I'm a big Harry Potter fan!

I'm also looking forward to seeing the physical coaster hardware; Intamin's family coasters are fantastic from what I've ridden, and this looks very twisty and fun! Even though I'm not a huge Intamin fan (likely due to the fact that I am yet to ride any of their properly highly acclaimed coasters), I have faith in them to pull off something excellent here!
 