IOA | Hagrid's Motorbike Adventure | Intamin LSM Launch (Dragon Challenge replacement)

Ethan

Well-Known Member
Unless the drop tracks are curved, I don't see these trains being that long? Assuming the trains are two riders wide, I can picture them being four to five rows long and them dispatching trains like their lives depend on it.
 

CrashCoaster

Well-Known Member
Why are the LSMs only in groups of 6 and not covering the whole track? Or are they just yet to be installed? I assume they went for LSMs instead of drive tyres for maintenance reasons.
 

peep

Well-Known Member
^They're just being installed in sections, think someone on InsideUniversal pointed out the connections for more can be seen on bits with them missing.
 

gabe

New Member
^They're just being installed in sections, think someone on InsideUniversal pointed out the connections for more can be seen on bits with them missing.
I was talking to Dan from Midway Mayhem earlier, and he said that they always have the attachment points along the entire launch section, even if they don’t get used, so I’m guessing there are no more LSMs to be installed as I see no other reason for them to start installing like they did.

Those are some HIGH QUALITY images!
Thanks! :)
 

Lofty

Social Media Team
Staff member
Social Media Team
I don't think this is going to be as slow as some are assuming in certain areas of the ride.
 