Now the opening is nearby i’m very curios how much down time this thing will have. Technical wise this thing is very complicated. I mean look how much down taron sometimes has and thats just a norman double launch coaster ? (i know the lsm’s an taron will probably use way more power than fly lsm’s) but still. Seeing how much moving parts this trains has (the whole seat is even a moving part) this thing will be capable of a lot of technical problems. Or maybe that’s maybe the reason why this project has taken so long. Maybe phantasialand wanted to battle the child sickness ( i don’t know if this is a english word but it means technical problems just when a ride opens ) first before detailing this project en opening it.
Now the opening is nearby i’m very curios how much down time this thing will have. Technical wise this thing is very complicated. I mean look how much down taron sometimes has and thats just a norman double launch coaster ? (i know the lsm’s an taron will probably use way more power than fly lsm’s) but still. Seeing how much moving parts this trains has (the whole seat is even a moving part) this thing will be capable of a lot of technical problems. Or maybe that’s maybe the reason why this project has taken so long. Maybe phantasialand wanted to battle the child sickness ( i don’t know if this is a english word but it means technical problems just when a ride opens ) first before detailing this project en opening it.
Oh my god. People are on it!!! AHHHHH!!! Source: phl_insider instagram
Let's hope the securities haven't seen it.
First People are whisteling the dark Ride part has a Story didnt thought they Would Really do it, i like!
What is that?View attachment 9661
I don't know if this photo is made recently.
It appeared today on Seeking the thrill whatsapp.
I think the place were the queue goes underground.What is that?
Ride exit, coming up from the off load platform underground. Picture is a number of months old.What is that?
Before the Lifthill is a Part of the Ride too, i think there are 2? corners before you Come to the LiftIt must be a really slow lifthill if there is a story. Right?
Yeah following the layout from the construction it does a 180° right turn out of the station along an underground room/tunnel, then turns 90° right up along the enclosed prelift - all in the sideways sitting position. Prelift ends with the turn into the flying position followed by the 1st launch. Am intrigued to see what the indoor scenes will bring.Before the Lifthill is a Part of the Ride too, i think there are 2? corners before you Come to the Lift