Maybe it’s a new way of building vertical loops that B&M has found to spread the forces better or something?So in a rather pointless (Interesting?) observation from viewing the track in the car park.
The new Nemesis loop is in 3 top track pieces like on Nemesis Inferno
Rather than the 2 track pieces which were on the previous loop.
Your welcome.
The colour scheme worked so well before. If it’s not broken don’t fix itI don't want to sound rude, but it's incredibly veiny *insert pun of choice here*.
I think it may have been more effective if the veins weren't such a bright colour, and weren't on every surface!
Unpopular opinion but i quite like it, it looks really retro cartoonish, I just hope they bring back the old logo and repaint the station black and red to match it
I agree. The more I see of the new colour scheme, the more I like it.Unpopular opinion but i quite like it, it looks really retro cartoonish, I just hope they bring back the old logo and repaint the station black and red to match it
100% agree....the old logo matches the new colour scheme perfectly
This, and wasn't it slowly crumbling? Unless they've refurbed it semi recently?I do hope I'm wrong. I think IF this new colour scheme is going to work, it's got to be in conjunction with a brand new look for the station. Right now, it looks incredibly clashy in my eyes.
they did refurbish it during the TLC program quite a few years ago, personally i think the station is going to get quite a significant overhaul, a lot of the surface is made of a foam and mesh with a sort of thick paint stuff, i think that it will get worked on and the station in general will get a repaint of some sort, black and red most likely in my opinion, considering the leg like things have been removed leads me to believe that they are being worked on or replaced entirely, a lot of speculation has been going around at the moment regarding animatronics which would be very interesting to seeThis, and wasn't it slowly crumbling? Unless they've refurbed it semi recently?
So in a rather pointless (Interesting?) observation from viewing the track in the car park.
The new Nemesis loop is in 3 top track pieces like on Nemesis Inferno
Rather than the 2 track pieces which were on the previous loop.
Your welcome.
Black Mamba at Phantasialand (2006) has the two piece loop though, maybe it was an aesthetics decision?Nice observation!
From what it looks like *to me* is that B&M used to do loops with that 2 piece top track, because if you look at all the Batmans, the loops all use the 2 piece, even the last built one through 1999 at SFOT.
Nemises Inferno, built in 2002, must have been a new iteration of that loop with the 3 piece top track.