I'd be inclined to agree. I have seen pretty impressive crane work lifting steelwork into place, but seeing as they're removing everything else I would be inclined to think they'd take the top off the tunnel to access the trackwork, rather than hoist it in/out.Lofty said:I think it could be - wouldn't be surprised if they remove the 'roof' to the tunnel and do it that way. I don't understand how they can install the LSM launch system without altering the tunnel structure itself?! (That is if the rumours are true and they are in fact removing the existing launch mechanism).
jay37415 said:On a side note- is it me or did anyone else notice the footers were missing in that last pic.
So it's not Dubai's but Malaysia's?GuyWithAStick said:Remember the Hulk they made for Universal Malaysia? Well, that's not happening anymore!
From Coaster Studio's FB page:
https://www.facebook.com/1376820432...820432592949/1553465964928394/?type=3&theater
Yeah...
Roomraider's already done it, figured out where exactly the track will be, noted the exact G's pulled through it and made a note of the weight based on the size and put all of it in his massive coaster brain while you were writing "So"Hyde said:So who wants to count bolts to try to figure out if the track matches with another train type?
6.Hyde said:So who wants to count bolts to try to figure out if the track matches with another train type?
DelPiero said:Roomraider's already done it, figured out where exactly the track will be, noted the exact G's pulled through it and made a note of the weight based on the size and put all of it in his massive coaster brain while you were writing "So"Hyde said:So who wants to count bolts to try to figure out if the track matches with another train type?