Somethings happening ok. I can't hide it any longer....
Can't give details but through work I now know this is the project area we are working on
Source: https://towersstreet.com/talk/threads/nemesis-sub-terra.4452/page-29#post-378308No drama I'm the same but for once actually know
all i know is new lighting effects are going into the building. I suspect its an updated version of what is already their to be honest. I don't actually know anything hardware or theme related.
My point being though, similar to yours, there is no need for endless pages of 'I wonder if something us happening, is it coming back' when it's clear it is, in some shape or form.
No offence taken, and I have to say if I knew exact project details I wouldn't be posting them. New lights isn't major discussion point.
So on that note I can confirm without a shadow of a doubt they are extending Nemesis to go through the sub terra pit.
I know this rumour has been seen plenty of times before, but this is the first time we've seen what could be construed as the park dropping subtle hints (what's with the sudden focus on the Phalanx on Nemesis and in all the Nemesis closure promotional material?), as well as the first time we've seen proper construction taking place outside the building (removing a substantial amount of queue line wood certainly hasn't happened in past years, and it would typically imply that the park intends to use the space in some capacity). Not to mention that it would make tons of sense as a way to both prop up Forbidden Valley's capacity and drum up hype for Nemesis' reopening in 2024.
No I was pointing out there was already a thread on this topic.I know this rumour has been seen plenty of times before, but this is the first time we've seen what could be construed as the park dropping subtle hints (what's with the sudden focus on the Phalanx on Nemesis and in all the Nemesis closure promotional material?), as well as the first time we've seen proper construction taking place outside the building (removing a substantial amount of queue line wood certainly hasn't happened in past years, and it would typically imply that the park intends to use the space in some capacity). Not to mention that it would make tons of sense as a way to both prop up Forbidden Valley's capacity and drum up hype for Nemesis' reopening in 2024.
Ah, sorry... I misinterpreted you there.No I was pointing out there was already a thread on this topic.
Given that the frame underneath appears to have been carefully retained, I reckon that this is a strong indication that those wooden boards will be replaced, in preparation for some kind of Sub-Terra reopening next year…This week has seen the wooden flooring for Nemesis Sub-Terra’s queue line removed.
— TowersTimes (@TowersTimes) October 14, 2022
Could this be in preparation for new flooring to be laid, to enable the attraction to reopen next year? pic.twitter.com/omzdSq9ohF
I know it talks about Nemesis, but the bits about “new head of the Phalanx John Dalton” and “reports of inside corruption” definitely seem like they could be hinting towards some sort of new storyline and rebirth for what was Sub-Terra.Nemesis went out with a bang yesterday… For those of you who missed the action, watch a news report from last night for everything you need to know. pic.twitter.com/dU8sWLNJhb
— Alton Towers Resort (@altontowers) November 7, 2022
Interestingly, the photos show that a new queue line is being built on top of the old boards... which would certainly suggest that the building is being reused, in my eyes.Fair bit of activity round the Sub Terra show building pic.twitter.com/HAP5Wb0IkY
— Jack (@ThemeParkJackk) December 6, 2022
if it were to reopen i doubt it would be as N-ST because that name already has a pretty negative reception, and this would also be the ideal "merlin moment" to market a newish ride, re themed at leastAn interesting drone shot has been captured by Danny from TowersStreet Talk that confirms that new queue line is indeed being installed, and that quite a bit of construction is going on in the area:
![]()
Interestingly, they also seem to have covered the Phalanx tank outside the building with tarpaulin...
I think this is a pretty strong sign that Sub-Terra is likely to be reopening in some form, personally!
Here's Danny's original post on TowersStreet, if you'd like to view it: https://towersstreet.com/talk/threads/nemesis-sub-terra.4452/page-49#post-390995