JoshC.
Strata Poster
Ah yes, I was remembering it wrong. Announced in December, built in January - my bad! But yes, my concern still stands.
It's a fair point about it being easier to make the theming off-site, etc though. I still wonder how possible it will be to:
-finish the roller coaster
-build food outlets / shop
-create the level of immersion of theming Phantasialand is known for (something which only truly comes when putting everything in place)
-and in some way integrate a hotel, or leave space for one to be built and subsequently build it
All in the period of 6-8 months.
It's Phantasialand, so I wouldn't rule it out, but I do have some doubts!
It's a fair point about it being easier to make the theming off-site, etc though. I still wonder how possible it will be to:
-finish the roller coaster
-build food outlets / shop
-create the level of immersion of theming Phantasialand is known for (something which only truly comes when putting everything in place)
-and in some way integrate a hotel, or leave space for one to be built and subsequently build it
All in the period of 6-8 months.
It's Phantasialand, so I wouldn't rule it out, but I do have some doubts!