Re: B&M Dive Machine for Gardaland in 2015 (?)
Visited the park last week, and can report that construction is very much underway! So much so that this topic might just need to be moved :wink: .
Anyway, here's my video showing the state of construction as it was last week:
[youtube]http://www.youtube.com/watch?v=nGIoVkrlppI[/youtube]
Just to highlight a few hunches I now possess from the video:
Now, if this isn't a tunnel, it'll be a major depression of some sort, which can only correspond, given the location of the footers, to the pullout from the first drop. The only way therefore, without interfering with space vertigo is to turn left out from the station building, then ascend the lift towards Mammut, followed by a full 180 degree turn preceding the drop. I may well be utterly wrong though, and can't work out by the current number of footers, what the following elements will be.
I can make no sense of the following footers (especially the one behind Space Vertigo) :
Also, is that an open space/exit at the very front of the building for the aforementioned left turn?
Plus, given the remaining space vertigo queue line, I would expect to see a new entrance point/almost complete rerouting of the queueline.
It's all still a bit of a mystery to me, and I should probably stop clutching at loose straws and go to bed....