I have a few thoughts here mostly related to the cost impact of the various ideas proposed thus far. The first assumption is that Cedar Point will be paying for all modifications to the ride, including new launch system, new queue line, new theming, new track, and new trains. If this was an unplanned expense (e.g. not a part of CP's 5-year portfolio plan, if such a thing even exists) then I'm thinking CP will want to entertain the cheapest option while still achieving their goals. I'm guessing the goal here is to rebrand the existing TTD experience into something new to help distance the accident (and all associated thoughts of a dangerous ride) from the GP's minds, while also providing a legitimately safer and more reliable experience (which pleases the state and insurance companies). So that brings us to the potential options and their associated costs.
Option 1 ($$$$) - Complete overhaul of ride experience including tower modification, LSM triple launch and spike, new trains, partial/complete re-track, new theme, new queue.
Option 2 ($$$) - Complete overhaul of launch system using LSM's, new launch track, new trains, new theme, new queue.
Option 3 ($$) - Keep existing launch system but replace worn parts, new cable, etc., new paint job, new theme, new queue.
I don't have much to go off of here but my gut still pushes me towards something similar to option 3. I love hydraulic launches and the idea of a new LSM launch still seems so far out to me from both a cost and engineering design perspective. I'm not sure if CP is willing to fork up the cash on such an expensive insurance liability. Curious to see what comes of future announcements.
I understand there are gaps in each of my options and I'm sure I'm missing details but hopefully this conveys the general idea I'm going for.
Option 1 ($$$$) - Complete overhaul of ride experience including tower modification, LSM triple launch and spike, new trains, partial/complete re-track, new theme, new queue.
Option 2 ($$$) - Complete overhaul of launch system using LSM's, new launch track, new trains, new theme, new queue.
Option 3 ($$) - Keep existing launch system but replace worn parts, new cable, etc., new paint job, new theme, new queue.
I don't have much to go off of here but my gut still pushes me towards something similar to option 3. I love hydraulic launches and the idea of a new LSM launch still seems so far out to me from both a cost and engineering design perspective. I'm not sure if CP is willing to fork up the cash on such an expensive insurance liability. Curious to see what comes of future announcements.
I understand there are gaps in each of my options and I'm sure I'm missing details but hopefully this conveys the general idea I'm going for.