Lagoon | Primordial | ART Engineering/Triotech Dark Ride Coaster

Lift hill is going up

file.php
 
No lift trough in the images, but the mounting points are there. Just to to the right of the antirollback steel. Odd that it wasn't installed before the track was set.
You're right, I do see the mounting points now that I look closer. But yeah, that's weird, I'm so used to it being pre-installed.

Also, why would it be attached to seperate pieces like that and not just directly to the cross ties?
 
Back
Top