Search results

  1. CSLKennyNI

    Phantasialand | Avoras | 2024

    Opening confirmed for tomorrow! Website page has gone live too. Minimum restrictions for this will be 90cm and 3 years old accompanied, 1,20cm alone. Also confirmed to be open for both summer and winter seasons. https://www.phantasialand.de/de/themenpark/einzigartige-attraktionen/adventure-trail/
  2. CSLKennyNI

    Phantasialand | Avoras | 2024

    First official look inside! Source Chris Theis- park operations manager https://www.instagram.com/p/CfrZnL7tfuM/?igshid=YmMyMTA2M2Y%3D EDIT: Poor quality video but gives some idea of the attraction Some more impressions from the staff previews
  3. CSLKennyNI

    Last Cred Review

    Even neater is those are former lift chains from Chiapas! Some nice recycling.😅
  4. CSLKennyNI

    Europa Park | Voltron | Mack Rides Stryker Coaster | 2024

    Important to keep in mind this is the first phase in a 10/15 plan to expand. From here over the Traumatica site to the main road around the park is the last physical space expansion the park can make. As mentioned in the first documentary episode it involves a lot of compact design and building...
  5. CSLKennyNI

    Europa Park | Voltron | Mack Rides Stryker Coaster | 2024

    There will be 142 track pieces which will take Mack 50 days to produce. Then the coaster will go vertical on site in January. Michael Mack has previously said the Rocking Boat ride model will eventually come to EP too. So it wasn't just a joke. Perhaps the next major addition post Voltron...
  6. CSLKennyNI

    Energylandia's Future Additions

    Dutch Wheels is part of Vekoma
  7. CSLKennyNI

    Europa Park | Voltron | Mack Rides Stryker Coaster | 2024

    Foundations taking shape for parts of the station complex. Behind the dismantling of a former parade storage hall is almost finished for the mid section of the out and back layout. Source
  8. CSLKennyNI

    Phantasialand | Avoras | 2024

    From RideOnBlog.de some updates on the Adventure Trail. Major construction work seems to have wrapped up with just finishing touches being done now. Entrance sign in place, queue time screen just missing from its frame. The Roller Slide which will be the trail's finale has been...
  9. CSLKennyNI

    Europa Park | Rulantica Extensions | Waterpark | 2023

    Progress on the Mack Rides Twist n Splash Tonnevirvel set to open this summer. It's being marketed as "the world's first Twist n Splash in a water park" rather amusingly. The runes on the ride barrels do actually spell 'Rulantica' and 'Twist and Splash'. An expansion with some small slides...
  10. CSLKennyNI

    Efteling | Spookslot Replacement | Intamin Dynamic Motion Stage | 2024

    It’s a new take on the Dynamic Theatre - a Theatre simulator hybrid. But compared to the dome ride people had suspected before this is more set focused than screens. Basically Spookslot for the 21st Century.
  11. CSLKennyNI

    Europa Park | Voltron | Mack Rides Stryker Coaster | 2024

    Construction has finally begun!
  12. CSLKennyNI

    Walibi Holland 2023

    RMC Raptor anyone? Looopings claim some insiders have told them they are in talks with RMC. Walibi-Holland-aast-op-Europese-primeur-spectaculaire-single-rail-coaster.html
  13. CSLKennyNI

    Most rides you've ever had on one attraction in a day?

    Not anymore was a few years back. Now a Teamleader at Eurosat.
  14. CSLKennyNI

    Most rides you've ever had on one attraction in a day?

    About 80 rides in a day on the Intamin observation tower EuroTower in Europa Park. …Although that answer is probably cheating as it was during work since it’s operated from inside. 😝
  15. CSLKennyNI

    Phantasialand | Avoras | 2024

    Park have filed with EUIPO a trademark for the new attraction. The inspired name will be "DEEP IN AFRICA - Adventure Trail" seemingly. Does what it says on the tin I guess; easier to explain to guests presumably is the reasoning. https://euipo.europa.eu/eSearch/#details/trademarks/018695907
  16. CSLKennyNI

    Britain and foreign languages

    As an Irishman I'd even make a case that it is still ongoing... But yeah you've hit the nail on the head in general.
  17. CSLKennyNI

    Phantasialand | Avoras | 2024

    I feel that would ruin the look of the theming feature. However this definitely seems to be going through the structure somehow there - whether they already made allowances/left space for an interior passage or stairs to accommodate this in future who knows. It’s quite possible considering how...
  18. CSLKennyNI

    Phantasialand | Avoras | 2024

    Mamba currently has a staggered opening this week for construction work on the Adventure Trail. Additionally while the flat ride move and maze demolition discussed in this thread have naturally led to speculation about the future of the Crazy Bats/Hollywood Tour site - it occurred to me...
  19. CSLKennyNI

    Phanny ERT

    The main walkway to the station from the entrance building is shared by the lines but at the station it is two separate short queues and gates for each - despite both having not yet been used simultaneously. Why Single Rider isn't used yet is likely corona still. F.L.Y.'s also hasn't yet been...
  20. CSLKennyNI

    Phanny ERT

    The single rider queue still exists. There are two doors on the right of the entrance and 4 gates into the station (first row, main queue, quick pass and single rider). The infrastructure for quick pass has existed since day 1 and is now only being used. The doors/gates for single rider remain...
Top