Posted a few minutes ago on Phantafriends, I've translated it for you...
https://www.phantafriends.de/topic/2346-neu-20xx-fly-baufortschritte/page/4/
Duron on Phantafriends said:The sound barrier in the direction of Wuze Town seems to me largely finished thematized. It forms a brick wall, the previously described large and high recesses have been discussed as a window front. So it looks like the outer wall of a big old factory building with the correspondingly large (and divided into many rectangles) windows (of which abandoned sheds always have some of the small windows already destroyed ...). The continuation of the soundproofing wall in the direction of Maus au Chocolat is currently similar (brick optics), but probably not immediately addressed. The foothills of the wall on the corner of Kaiserplatz are still not thematized, but at least largely scaffolded.
Yesterday at around 4 pm there were a total of 21 rail parts on the employee parking lot, today at 11 o'clock there were only 20 left.
At around 11:30 am today, Barth transported two support parts from the employee parking lot to the construction site, which were deposited directly after the construction site entrance. Overall, there were now two longer and two shorter support parts, of which two (long / short) were probably screwed together.
In the current observation period, in addition to the large crane, two Barth crane trucks were in operation, one of which took care of the support parts and the other in the middle of the construction site (behind the big crane), so somehow one seems to be standing there with so much equipment from the construction site entrance to be able to get there) another small crane (a kind of lifting platform) offset. The smaller yellow crane built behind the fire service entrance at the administration building was not in use.