What's new

Emerald Park News/Discussion

rollercoaster2

Mega Poster
Tayto-Park-Roller-Coaster-2020-CGI01-cropB.jpg


http://www.pedersenfocus.ie/wp-cont...ayto-Park-Roller-Coaster-2020-CGI01-cropB.jpg (for extra zoom) I tried different link combos for hidden images both nope despite the fact there are others out there somewhere.

A bit higher quality image.

I know they said they wanted to direct noise back in to the park but putting the trains backward may be going a bit too far ?
 
Last edited:

CSLKennyNI

Giga Poster
The appeal failed! Tayto Park have the green light to go ahead.

AN BORD PLEANÁLA has given the green light to Tayto Park for a new €15.5 million ‘Coaster 2021’ rollercoaster for the theme park.

The grant of permission by the appeals board clears the way for the construction of the rollercoaster which is made up of a 31 metre high and 748 metre long Suspended Thrill Coaster (STC) and a 24.2 metre high 238 metre long Family Boomerang (FB) ride.

The decision brings to an end a two year four month long planning battle by Tayto Park owner Raymond Coyle to secure planning permission for the new attraction.

A previous rollercoaster proposed for Tayto Park was refused planning permission in July 2019 by the appeals board due, in part, to the noise impact of people’s screams from the rollercoaster on residents’ properties.

Now, the board has overruled its own inspector, Dolores McCague who recommended that planning permission be refused for the new project.



McCague recommended that planning be refused due to the the noise impact on nearby residential homes and that it would depreciate the value of properties in the area.

Coyle’s Ashbourne Visitor Centre Ltd’s revised plans provides for a planned spend on €1.5 million on 14 separate noise reduction methods.

However, during the course of her 58 page report, McCague stated that the application did not reveal the noise impact from screaming by patrons on the rollercoaster.

McCague stated: “A scream is a primitive sound, calling out danger and shouting for help. It is a particularly distinctive sound. Screaming has a much more visceral impact on the listener than any other sound.”

McCague also recommended that planning permission be refused as the development would exacerbate the capacity and congestion issues on the N2.

However, the board found that the proposed development would not have an adverse impact on population and human health associated with noise.

The board stated that it was satisfied that the mitigation measures proposed are adequate and acceptable. The board also found that the proposal would not exacerbate the current identified capacity and congestion issues on the N2.


The board decision upholds a decision by Meath County Council to grant planning permission for the project last year.

However, the proposed development came before the appeals board after local residents, Donal Greene & Clare Smith along with Jeremy Butcher appealed the Council decision.

Plans for the new rollercoaster have been drawn up by Dutch rollercoaster maker, Vekoma which has made rollercoasters across the world such as Space Mountain and Big Thunder Mountain for Disney.

Coyle has already promised that any screams by passengers will be drowned out.

The designers reoriented the tracks to direct noise back into the park and away from housing in the area and some of the other noise-reducing design features include three tunnels; underground sections; extensive planting of trees, shrubbery and foliage and a 6m high and 100m long sound barrier.

Planning documentation lodged with the plan by Tayto Park stated if the rollercoaster doesn’t proceed “the longer-term viability of the Park would be brought into question”.
 

liam

Roller Poster
:):):)
God that was a marathon wait, i bet the owner is very pleased today. Just made it over the line and i bet they will watch every bit of the construction to see if they can complain again and stop it happening.
 

CrashCoaster

CF Legend
I just hope they still have the money to invest after COVID, plus they probably spent a fortune getting the planning application to this point.
I mean they are owned by Ireland's largest crisp company so I have no worries about their short term finances.

Also, I guess one good thing has come out of this whole ordeal. The coasters had to be re-designed from the originally planned Tripsdrill variants, meaning custom layouts instead of clones.
 
Last edited:
Top